وظائف الكويتوظائف عالمية

The United Nations Office for Project Services is recruiting in Kuwait for the following positions in various specializations (5 job opportunities) مكتب الأمم المتحدة لخدمات المشاريع يقوم بالتوظيف في الكويت للوظائف التالية بتخصصات مختلفة ( 5 فرص عمل )

Kuwait Jobs Today: The United Nations Office for Project Services announces new job opportunities. Are you looking for job opportunities in Kuwait? The United Nations Office for Project Services announces the opening of recruitment for many jobs in various specializations in Kuwaiton today’s date. These opportunities are available to all nationalities. Learn about the available jobs and how to apply through the following advertisement.

Required jobs in The United Nations Office for Project Services and their details:

↔️

1- Senior engineer in electrical engineering (Renewable energies)

Functional Responsibilities:

  • Under the supervision of the project manager(s), and following the specific needs of each mission, the Principal Electrical Engineer (Renewable Energy) will be responsible for the design, sizing, supervision and monitoring of installation work for solar systems. He will play a key role in project management, ensuring that technical studies and works are carried out efficiently and in accordance with technical and regulatory standards.

The consultant will have to carry out the tasks below:

  •  Technical studies :
  • Analysis of Energy Needs: 
  •  Carry out detailed assessments of the energy needs of target infrastructure
  •  Collect and analyze data to determine the most suitable solar solutions
  •  Support the pre-selection of equipment and also the verification of the proposed systems against local standards and UNOPS standards.
  • Design and Sizing of Solar Systems: 
  •  Design solar systems taking into account technical constraints and specific site needs
  •  Use design and simulation software (for example, PVsyst, AutoCAD) to optimize the sizing of installations.

  • Development of specifications: 
  •  Write technical specifications for equipment and installation work
  •  Prepare the necessary documents for calls for tenders and selection of suppliers and installers.
  •  Monitoring of Studies and Works:
  • Supervision of Technical Studies: 
  •  Ensure monitoring of technical studies carried out by consultants and design offices
  •  Validate feasibility studies, plans and technical diagrams
  •  Assistance to Design Offices
  •  coordination with other designers
  •  Provide technical support to design offices to ensure the quality and relevance of studies
  •  Provide advice and recommendations to improve technical proposals.
  • Coordination of Installation Work: 
  •  Plan and coordinate installation work with field teams
  •  Supervise the execution of work to ensure compliance with plans and technical specifications.

2- Lead Mechanical Engineer( Fluides – Concepteur ) Retainer 

Functional Responsibilities:

Sous la supervision du ou des chef(s) de projet, et suivant les besoins spécifiques de chaque mission, le consultant devra accomplir les tâches ci-dessous:

  • Réaliser les plans techniques liés aux installations de plomberie, et/ou CVC dans le cadre de chaque projet, en prenant en compte la dépose de toute installation défectueuse le cas échéant. Cela inclut l’analyse des plans existants, la conception des nouvelles installations et la coordination avec les autres intervenants.
  • Analyse des plans existants : L’ingénieur fluides devra analyser en détail les plans existants afin d’identifier les installations défectueuses ou obsolètes. 
  • Dépose des installations défectueuses : Sur la base des plans existants réalisés par l’architecte et avec la coordination des ingénieurs du projet, l’ingénieur fluides devra identifier les installations défectueuses à déposer. Cela comprend également le dimensionnement des équipements (sanitaires, réseaux de climatisation, etc. L’ingénieur devra prévoir les méthodes appropriées pour déposer ces installations tout en assurant la sécurité des travailleurs et la protection du bâtiment. 
  • Conception des nouvelles installations de plomberie et/ou CVC : en se basant sur les plans produits par l’architecte ou tout autre entité et à la demande du Chef de Projet, l’ingénieur fluides devra concevoir les nouvelles installations. 

  • Coordination avec les autres intervenants : L’ingénieur fluides devra collaborer étroitement avec les autres professionnels impliqués dans le projet, tels que l’architecte, l’ingénieur électrique et l’équipe technique du projet ou tout autre membre se joignant au projet. Il devra assurer, avec l’équipe technique du projet, une coordination efficace entre les différents corps de métier pour garantir l’intégration harmonieuse des nouvelles installations dans le bâtiment. 
  • Préparer la documentation technique, y compris les notes de calculs, les spécifications et les manuels d’utilisation, etc. 
  • Supervision de Projet : Planifier et superviser l’installation, le fonctionnement, et la réparation des systèmes conçus. 
  • Effectuer des tests et des essais pour s’assurer que les systèmes et équipements respectent les spécifications et les normes de sécurité. 
  • Diagnostiquer et résoudre les problèmes des systèmes installés, et assurer l’élaboration des plans de maintenance préventive et corrective. 
  • Assurer la conformité des projets aux normes et règlements en vigueur. 
  • Former et soutenir les équipes techniques, les utilisateurs et le personnel de maintenance sur l’utilisation et la gestion des systèmes installés. 

3- Lead Architect Retainer 

For existing sites requiring rehabilitation, the missions may include:

  • Site survey: The architect must go to the sites and carry out a complete survey of each building affected by the renovations. The survey must include all dimensions, locations of openings (doors, windows), existing installations (plumbing, electricity, etc.), as well as any other information relevant to the creation of the plans. 
  • Existing plans: The architect must produce existing plans for each site, including plans, sections, facades, perspective views, etc. The plans must be precise and to scale, faithfully reflecting the current condition of the buildings. 
  • Demolition plans: On the basis of the surveys carried out and in accordance with the project, the architect must produce the demolition plans. This may include the removal of the roof, plumbing installations, interior partitions and wooden joinery. Demolition plans must indicate the specific areas to be demolished, complying with all applicable regulations and standards. 
  • Project plans: The architect must also produce project plans corresponding to the work to be undertaken. 
  • Technical specifications: The architect will draft detailed technical specifications for each aspect of the works on these packages, including the materials to be used, construction methods and any regulations/standards to be respected 
  • The consultant must participate in the provisional and final technical acceptance of the work.

4- Senior Engineer in Civil Engineering Retainer

Functional Responsibilities:

Sous la supervision du ou des chef(s) de projet, et suivant les besoins spécifiques de chaque mission, le consultant devra accomplir les tâches ci-dessous:

  • Réalisation des plans techniques: L’ingénieur en génie civil devra élaborer les plans structure. Cela inclut l’analyse des plans existants le cas échéant, la conception des nouvelles structures, et la coordination avec les autres intervenants.
  • Conception des nouvelles constructions: En se basant sur les plans fournis par l’architecte ou d’autres entités et à la demande du Chef de Projet, l’ingénieur en génie civil devra concevoir les nouvelles structures. Cela inclut la définition des spécifications techniques, le choix des matériaux et la conception des éléments pour répondre aux besoins fonctionnels du projet. 
  • Coordination avec les autres intervenants: L’ingénieur en génie civil devra collaborer étroitement avec les autres professionnels impliqués dans le projet, tels que les architectes, les ingénieurs fluides, les ingénieurs électriques, et les membres de l’équipe technique du projet. Il devra assurer une coordination efficace entre les différentes disciplines pour garantir l’intégration harmonieuse des éléments structurels dans le bâtiment et la conformité avec les objectifs du projet. 
  • Préparation de la Documentation Technique : Préparer la documentation technique nécessaire, y compris les notes de calcul, les spécifications des matériaux et des méthodes de construction. 
  • Supervision de Projet : Planifier et superviser les travaux. 

5- Senior Electrical Engineer (Retainer, multiple positions) EN-ES 

Functional Responsibilities:

  • The home-based Senior Electrical Engineer will be responsible for the provision of electrical engineering services to IPMG work streams, country offices, and project teams. The scope of these services will be defined with each request for services and may include technical review, design, and guidance
  • The Senior Electrical Engineer will play a key role in ensuring the safety and quality of UNOPS infrastructure works. On a request basis from IPMG and country offices, the Senior Electrical Engineer will be expected to fulfill the following responsibilities in line with industry standards and applicable national and international codes and guidelines:

Education/Experience/Language requirements: Desired experience:

 Education requirements: 

  • Master’s Degree in Electrical Engineering from an accredited university is required. 
  • Bachelor’s Degree or equivalent with two additional years of relevant experience may be accepted in lieu of Master’s Degree (total 9 years of experience). 
  •  Work Experience: Required experience:
  • At least 7 years of progressively responsible experience in electrical engineering with strong knowledge of design, installation, operation and monitoring of electrical power supply and distribution systems, especially building wiring installations, is required. 
  • Understanding of and experience with renewable energy solutions, including solar and wind, as well as stand-alone power systems and microgrids, is highly desired. 
  • Understanding of and experience with electrical works for hospitals, health clinics, and waste water treatment plants is desired. 
  • Understanding of and experience in development infrastructure sector is desired. 
  • Knowledge of sustainable and resilient approaches to electrical engineering and green technologies is an asset. 

 Languages:

  • Fluency in English required. 
  • Fluency in Spanish is required. 

 Certification:

  • Membership of a Professional Institution at Chartered / Professional Eng / Eur Ing or similar is desired. 
  • As a UNOPS ICA retainer, the incumbent is required to complete four (4) online mandatory courses at present upon signature of your contract and prior to commencing any retainer assignment related to Ethics and Integrity, the Prevention of Sexual Exploitation and Abuse, Security awareness and Cybersecurity Awareness Training. These courses are made available on UNOPS learning platform and shall be completed within the first three months following the contract signature, at no cost for UNOPS. 

1- مهندس أول في الهندسة الكهربائية (طاقات متجددة)

المسؤوليات الوظيفية:

  • تحت إشراف مدير المشروع (مديري المشروع)، ووفقًا للاحتياجات المحددة لكل مهمة، سيكون مهندس الكهرباء الرئيسي (الطاقة المتجددة) مسؤولاً عن تصميم وتحديد حجم والإشراف على أعمال التركيب لأنظمة الطاقة الشمسية ومراقبتها. سيلعب دورًا رئيسيًا في إدارة المشروع، وضمان إجراء الدراسات والأعمال الفنية بكفاءة ووفقًا للمعايير الفنية والتنظيمية.

سيتعين على المستشار تنفيذ المهام التالية:

  •  الدراسات الفنية :
  • تحليل احتياجات الطاقة: 
  •  إجراء تقييمات مفصلة لاحتياجات الطاقة للبنية التحتية المستهدفة
  •  جمع وتحليل البيانات لتحديد الحلول الشمسية الأكثر ملاءمة
  •  دعم الاختيار المسبق للمعدات وكذلك التحقق من الأنظمة المقترحة مقابل المعايير المحلية ومعايير مكتب الأمم المتحدة لخدمات المشاريع.
  • تصميم وقياس أنظمة الطاقة الشمسية: 
  •  تصميم أنظمة الطاقة الشمسية مع مراعاة القيود الفنية واحتياجات الموقع المحددة
  •  استخدم برامج التصميم والمحاكاة (على سبيل المثال، PVsyst، AutoCAD) لتحسين حجم التركيبات.

  • تطوير المواصفات: 
  •  كتابة المواصفات الفنية للمعدات وأعمال التركيب
  •  إعداد الوثائق اللازمة لطرح العطاءات واختيار الموردين والمُركبين.
  •  متابعة الدراسات والأعمال:
  • الإشراف على الدراسات الفنية: 
  •  ضمان متابعة الدراسات الفنية التي يقوم بها الاستشاريون ومكاتب التصميم
  •  التحقق من صحة دراسات الجدوى والخطط والرسوم البيانية الفنية
  •  المساعدة لمكاتب التصميم
  •  التنسيق مع المصممين الآخرين
  •  تقديم الدعم الفني لمكاتب التصميم لضمان جودة ومناسبة الدراسات
  •  تقديم المشورة والتوصيات لتحسين المقترحات الفنية.
  • تنسيق أعمال التثبيت: 
  •  التخطيط وتنسيق أعمال التثبيت مع الفرق الميدانية
  •  الإشراف على تنفيذ الأعمال للتأكد من مطابقتها للخطط والمواصفات الفنية.

2- مهندس ميكانيكي رئيسي (السوائل – مصمم) 

المسؤوليات الوظيفية:

تحت إشراف مدير (مدراء) المشروع، ووفقًا للاحتياجات المحددة لكل مهمة، سيتعين على الاستشاري إنجاز المهام التالية:

  • إنتاج الخطط الفنية المتعلقة بتركيبات السباكة و/أو التدفئة والتهوية وتكييف الهواء كجزء من كل مشروع، مع مراعاة إزالة أي تركيب معيب إن أمكن. ويشمل ذلك تحليل الخطط الحالية وتصميم مرافق جديدة والتنسيق مع أصحاب المصلحة الآخرين.
  • تحليل المخططات الموجودة: يجب على مهندس الموائع تحليل المخططات الموجودة بالتفصيل من أجل تحديد التركيبات المعيبة أو المتقادمة. 
  • إزالة التركيبات المعيبة: بناءً على المخططات الحالية التي ينتجها المهندس المعماري وبالتنسيق مع مهندسي المشروع، يجب على مهندس الموائع تحديد التركيبات المعيبة المراد إزالتها. ويشمل ذلك أيضًا تحجيم المعدات (المرافق الصحية وشبكات التكييف وغيرها. ويجب على المهندس تخطيط الطرق المناسبة لإزالة هذه المنشآت مع ضمان سلامة العمال وحماية المبنى. 
  • تصميم تركيبات السباكة و/أو التدفئة والتهوية وتكييف الهواء الجديدة: بناءً على المخططات التي أعدها المهندس المعماري أو أي كيان آخر وبناءً على طلب مدير المشروع، سيتعين على مهندس السوائل تصميم التركيبات الجديدة. 

  • التنسيق مع أصحاب المصلحة الآخرين: سيتعين على مهندس الموائع التعاون بشكل وثيق مع المهنيين الآخرين المشاركين في المشروع، مثل المهندس المعماري والمهندس الكهربائي وفريق المشروع الفني أو أي عضو آخر ينضم إلى المشروع. وسيتعين عليه أن يضمن، مع فريق المشروع الفني، التنسيق الفعال بين مختلف المهن لضمان التكامل المتناغم للمنشآت الجديدة في المبنى. 
  • قم بإعداد الوثائق الفنية، بما في ذلك ملاحظات الحساب والمواصفات وأدلة المستخدم، وما إلى ذلك. 
  • الإشراف على المشروع: التخطيط والإشراف على تركيب وتشغيل وإصلاح الأنظمة المصممة. 
  • إجراء الاختبارات والتجارب للتأكد من أن الأنظمة والمعدات تلبي مواصفات ومعايير السلامة. 
  • تشخيص وحل مشاكل الأنظمة المثبتة، والتأكد من وضع خطط الصيانة الوقائية والتصحيحية. 
  • ضمان امتثال المشاريع للمعايير واللوائح الحالية. 
  • تدريب ودعم الفرق الفنية والمستخدمين وموظفي الصيانة على استخدام وإدارة الأنظمة المثبتة. 

3- رئيس المهندسين المعماريين 

بالنسبة للمواقع الحالية التي تتطلب إعادة تأهيل، قد تشمل المهام ما يلي:

  • مسح الموقع: يجب على المهندس المعماري الذهاب إلى المواقع وإجراء مسح كامل لكل مبنى متأثر بالتجديدات. يجب أن يشمل المسح جميع الأبعاد ومواقع الفتحات (الأبواب والنوافذ) والتركيبات الموجودة (السباكة والكهرباء وما إلى ذلك) بالإضافة إلى أي معلومات أخرى ذات صلة بإنشاء المخططات. 
  • الخطط الموجودة: يجب على المهندس المعماري إعداد خطط موجودة لكل موقع، بما في ذلك الخطط والأقسام والواجهات والمناظر المنظورية وما إلى ذلك. يجب أن تكون الخطط دقيقة ووفق مقياس يعكس بدقة الحالة الحالية للمباني. 
  • مخططات الهدم: على أساس المسوحات التي أجريت ووفقًا للمشروع، يجب على المهندس المعماري إعداد مخططات الهدم. وقد يشمل ذلك إزالة السقف وتركيبات السباكة والحواجز الداخلية والنجارة الخشبية. ويجب أن تشير مخططات الهدم إلى المناطق المحددة التي سيتم هدمها، مع الالتزام بجميع اللوائح والمعايير المعمول بها. 
  • مخططات المشروع: يجب على المهندس المعماري أيضًا إعداد مخططات المشروع المقابلة للعمل الذي سيتم تنفيذه. 
  • المواصفات الفنية: سيقوم المهندس المعماري بصياغة المواصفات الفنية التفصيلية لكل جانب من جوانب الأعمال في هذه الحزم، بما في ذلك المواد التي سيتم استخدامها، وطرق البناء وأي لوائح/معايير يجب مراعاتها 
  • يجب على المستشار المشاركة في القبول الفني المؤقت والنهائي للعمل.

4- مهندس أول في الهندسة المدنية

المسؤوليات الوظيفية:

تحت إشراف مدير (مدراء) المشروع، ووفقًا للاحتياجات المحددة لكل مهمة، سيتعين على الاستشاري إنجاز المهام التالية:

  • إنشاء الخطط الفنية: سيتعين على المهندس المدني تطوير الخطط الهيكلية. ويتضمن ذلك تحليل الخطط الحالية عند الاقتضاء، وتصميم هياكل جديدة، والتنسيق مع أصحاب المصلحة الآخرين.
  • تصميم المباني الجديدة: بناءً على المخططات المقدمة من المهندس المعماري أو الجهات الأخرى وبناءً على طلب مدير المشروع، سيتعين على المهندس المدني تصميم الهياكل الجديدة. يتضمن ذلك تحديد المواصفات الفنية واختيار المواد وعناصر التصميم لتلبية الاحتياجات الوظيفية للمشروع. 
  • التنسيق مع أصحاب المصلحة الآخرين: سيحتاج المهندس المدني إلى التعاون بشكل وثيق مع المهنيين الآخرين المشاركين في المشروع، مثل المهندسين المعماريين ومهندسي السوائل ومهندسي الكهرباء وأعضاء فريق المشروع الفني. ويجب عليه ضمان التنسيق الفعال بين التخصصات المختلفة لضمان التكامل المتناغم للعناصر الهيكلية في المبنى والامتثال لأهداف المشروع. 
  • إعداد الوثائق الفنية: إعداد الوثائق الفنية اللازمة، بما في ذلك الملاحظات الحسابية ومواصفات المواد وطرق البناء. 
  • الإشراف على المشروع: التخطيط والإشراف على العمل. 

5- مهندس كهرباء أول (متعاقد، وظائف متعددة) EN-ES 

المسؤوليات الوظيفية:

  • سيكون مهندس الكهرباء الرئيسي الذي يعمل من المنزل مسؤولاً عن توفير خدمات الهندسة الكهربائية لمجالات عمل IPMG والمكاتب القطرية وفرق المشروع. سيتم تحديد نطاق هذه الخدمات مع كل طلب للخدمات وقد يشمل المراجعة الفنية والتصميم والتوجيه
  • سيلعب مهندس الكهرباء الرئيسي دورًا رئيسيًا في ضمان سلامة وجودة أعمال البنية التحتية لمكتب الأمم المتحدة لخدمات المشاريع. بناءً على طلب من IPMG والمكاتب القطرية، من المتوقع أن يفي مهندس الكهرباء الرئيسي بالمسؤوليات التالية بما يتماشى مع معايير الصناعة والرموز والمبادئ التوجيهية الوطنية والدولية المعمول بها:

متطلبات التعليم / الخبرة / اللغة: الخبرة المرغوبة:

 متطلبات التعليم: 

  • يشترط الحصول على درجة الماجستير في الهندسة الكهربائية من جامعة معتمدة. 
  • يمكن قبول درجة البكالوريوس أو ما يعادلها مع عامين إضافيين من الخبرة ذات الصلة بدلاً من درجة الماجستير (إجمالي 9 سنوات من الخبرة). 
  •  الخبرة العملية: الخبرة المطلوبة:
  • – خبرة لا تقل عن 7 سنوات في مجال الهندسة الكهربائية مع معرفة قوية بتصميم وتركيب وتشغيل ومراقبة أنظمة إمداد وتوزيع الطاقة الكهربائية، وخاصة تركيبات الأسلاك في المباني. 
  • من المرغوب فيه للغاية أن يكون لديك فهم وخبرة في حلول الطاقة المتجددة، بما في ذلك الطاقة الشمسية وطاقة الرياح، بالإضافة إلى أنظمة الطاقة المستقلة والشبكات الصغيرة. 
  • يُفضل أن يكون لديك فهم وخبرة في الأعمال الكهربائية للمستشفيات والعيادات الصحية ومحطات معالجة مياه الصرف الصحي. 
  • من المرغوب فيه أن يكون لديك فهم وخبرة في قطاع البنية التحتية التنموية. 
  • إن معرفة الأساليب المستدامة والمرنة في مجال الهندسة الكهربائية والتقنيات الخضراء تشكل ميزة إضافية. 

 اللغات:

  • يُشترط إتقان اللغة الإنجليزية. 
  • يُشترط إتقان اللغة الإسبانية. 

 شهادة:

  • من المرغوب فيه أن يكون لديك عضوية في مؤسسة مهنية في الهندسة المعتمدة / المهنية / الأوروبية أو ما شابه ذلك. 
  • باعتبارك موظفًا في برنامج ICA التابع لمكتب الأمم المتحدة لخدمات المشاريع، يتعين على الموظف إكمال أربع (4) دورات إلزامية عبر الإنترنت في الوقت الحالي عند توقيع العقد وقبل البدء في أي مهمة تتعلق بالأخلاق والنزاهة، ومنع الاستغلال الجنسي والإساءة، والوعي الأمني، والتدريب على الوعي بالأمن السيبراني. تتوفر هذه الدورات على منصة التعلم التابعة لمكتب الأمم المتحدة لخدمات المشاريع ويجب إكمالها في غضون الأشهر الثلاثة الأولى التالية لتوقيع العقد، دون أي تكلفة على مكتب الأمم المتحدة لخدمات المشاريع. 

Source and additional details

  • Job source: The official website of the company
  • Posted Date: 4-8-2024 (Please check the date before applying).
  • Required Nationalities: All nationalities.

 




Source link

مقالات ذات صلة

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

زر الذهاب إلى الأعلى